NEWS

July 2nd, 2020

Hyundai Steel awards contract for Repair of Blast Furnace No. 3

Danieli Corus has received an order for the repair the bosh area of Blast Furnace No. 3 at the Dangjin, South Korea integrated steel plant operated by Hyundai Steel Company. The 4525 m³ working volume Blast Furnace, which was originally commissioned in 2013, will be upgraded to the "Hoogovens" cooling and lining design based on high-conductivity graphite refractories and copper plate coolers in the critical bosh area.

Process conditions in the bosh area are characterized by high thermal, mechanical and chemical loads. The "Hoogovens" design has the longest proven lifetime capability, as demonstrated at plants around the world where campaign lengths in excess of 20 or even 30 years have been achieved. We are confident that this upgrade will prove its exceptional value for this leading steel producer for many years.